Check areas and quantities
Are rooms, connections and approximate quantities identifiable? Linear metres describe something different from square metres. For several rooms, the mapping should stay clear.
Read the preparation work
Existing-joint removal, substrate preparation and new installation are separate steps. The actual quote determines which are included. An uncertain existing build-up may require further checks.
Clarify assumptions and extras
Look for substrate, access and build-up assumptions. Ask about concealed damage, inaccessible areas and possible additional work. Agree changes to the scope before they are carried out.
Discuss organisation and care
Agree access, installation period and reuse arrangements alongside the scope. Care and use instructions apply to the actual product and agreed installation.
Your project in Bern
For a property in Bern or the surrounding area, please include the exact address. In occupied homes, access and bathroom use need to be agreed. For rented properties, a management contact helps clarify responsibility and approval.
